Feeds:
Posts
Comments

Posts Tagged ‘ROW Adventures’

We got word from our friends and colleagues in the Lochsa corridor that the first of the permitted mega-load shipments by Conoco-Phillips are indeed scheduled for tonight, running from the port of Lewiston to mile marker 38.8. Local folks are expected to be along the highway as observers, but organizers are urging that the shipments not be disrupted.

The shipment, of course, represents a lost battle, but not necessarily the war over ITD’s apparent willingness to cede a Wild and Scenic River highway to industry for a permanent “high and wide” corridor.  The four permitted shipments are only for Conoco-Phillips to deliver huge coke drums to Billings, Montana.  The 200-some shipments by Imperial Oil and ExxonMobil to deliver equipment to the Alberta tar sands is another story altogether, and have not been permitted — in either Idaho or Montana. ITD has made repeated assurances that the ConocoPhillips permits do not set a precedent.

After the permits were granted by ITD hearing examiner, the residents and business owners, including ROW Adventures proprietor Peter Grubb, who intervened before the Idaho Transportation Department (ITD) to challenge the  shipments declined to to file further legal appeals of the ITD permits.

In a press release, Karen “Borg” Hendrickson, one of the intervenors said,  “We are proud of the work we have done over the last 10 months helping educate our friends and neighbors about the threats that hundreds of megaloads pose for the communities of the Highway 12 corridor.”

Her husband, Linwood Laughy, stated that the challengers intend to monitor the coke drum loads. “We think it is important for local residents to understand exactly how massive these shipments are and what their impacts may be for traffic and business on Highway 12, but we do not suggest that anyone attempt to interfere with them,” Laughy said.

Key parameters in the permits:

TIME OF TRAVEL 10PM TO 5:30AM

TOTAL GROSS WEIGHT (INCLUDING HELPER DOLLIES) 731,500 LBS.

BRIDGES FOR WHICH HELPER DOLLIES ARE REQUIRED: ARROW (MP14.9), MAGGIE CREEK (MP 76.8), FISH CREEK (MP 120)

10 MINUTE TRAFFIC DELAY:

Oncoming traffic shall not be delayed greater than 10 minutes, except at … points listed in the traffic control plan ….There are 12 zones where Emmert will be allowed to exceed the 10 minute time frame…  [Note: ITD considers a “delay” a full stop.  ITD does not consider cars following the shipment convoys — no matter how slowly — “delayed.”]

HIGHWAY TRAFFIC SHALL NOT BE DIVERTED ONTO AN UNPAVED SURFACE.

EMMERT IS AUTHORIZED TO BARRICADE THE APPROVED TURNOUTS FOR EXCLUSIVE USE FOR THE WIDE LOADS UP TO 24 HOURS IN ADVANCE FOR EACH MOVE.

TRAVEL RESTRICTIONS:

Tires of the tractor and trailer shall stay within the fog line, except when exiting the roadway at approved turnout traffic clearing locations. The carrier has identified 5 locations where the load tires will cross the fogline but remain on the paved surface; M.P. 48.5, 48.7, 52.6, 54.3 and 157.

The outside tires will not extend closer than 1.0 foot to the face of [guard]rail at any time nor will the guardrail be allowed to be moved. Emmert will furnish … plywood to be laid down in front of the tires as the load progresses should the shoulder show distress to distribute the load as it passes bt…

The outside tires shall be illuminated to allow for inspection of this requirement.

TRAVEL IS ALLOWED 7 DAYS A WEEK, EXCEPT FOR HOLIDAYS AND HOLIDAY WEEKENDS.

PARKING LOCATIONS AFTER 5:30 A.M.

DAY 1: MP 38.8 (NEAR OROFINO)

DAY 2: MP 73.7 (KOOSKIA)

DAY 3: MP 126.9 (6 MILES ABOVE FISH CREEK)

DAY 4: JUST EAST OF THE ID/MT BORDER

 

 

 

Read Full Post »

You’re going to need to shovel yourselves out by Thursday. Our longtime friend and supporter Peter Grubb of ROW Adventures will be at the Iron Horse at noon to talk about the Highway 12 megaloads controversy.

Peter is one of three courageous plaintiffs in the legal battle to force Idaho Department of Transportation to abide by its own rules and allow public input before permitting “overlegal” truck loads up the Lochsa River corridor.

Imperial Oil SHT Load Module. Seriously. That huge thing goes on a truck. (courtesy fightinggoliath.org)

Four super huge truck loads (“SHT loads” as coined by our friends at Idaho Conservation League) are proposed by ConocoPhillips in order to deliver massive oil equipment from the Port of Lewiston to a refinery in Billings. But this is merely the proverbial camel’s nose under IDT’s tent. Imperial Oil / Exxon Mobil has some 207 SHT loads proposed to take equipment from Lewiston, through Montana, to the massive tar sands oil development in Alberta. There is worry that the scenic Lochsa River byway will turn into a permanent “high and wide” industrial corridor.

Because of the connection to the tar sands project, the Highway 12 issue has international environmental implications. But the problems are acutely local for Peter, who is the owner and operator of the popular Riverdance Lodge along the highway. The slow rolling traffic backups caused by the SHT loads will create a safety hazard and huge inconvenience to Peter’s guests and his business.

Peter, his Lochsa River neighbors, and his Advocates for the West lawyers have been fighting goliath, just to get a fair hearing. They’ve won their legal challenges so far, and they have earned a full-blown evidentiary hearing scheduled late next week in Boise.

Hope you can join us Thursday to learn more.  And to give Peter a well-deserved round of applause.

UPDATE: See followup on the meeting here. With video!

Read Full Post »

%d bloggers like this: